917011515761 917011515761
P2 Power Solutions Pvt. Ltd.

Our Solutions


  • IT / ITES Industries Solution
    Typical Challenges Failure of expensive electronic cards Overloading and heating of neutral conductor Data loss due to sudden outages and down-time   Root Cause Analysis High harmonic distortion generated by UPS, Rectifiers, VFDs, Battery Chargers as main reason of electronic cards

    Enquiry Now

    IT / ITES Industries Solution

  • Auto Welding Industries Solution
    Typical Challenges Extremely fast fluctuating load profile iTDD exceeding limits set as per IEEE standard Low PF (both leading and lagging) High load unbalance Increased losses due to high harmonics Failure of welding transformers Tripping of relays, protective circuits etc.   Root Cause

    Enquiry Now

    Auto Welding Industries Solution

  • Textiles Spinning Industries Solution
    Typical Challenges Periodic failure of expensive electronic cards and therefore abrupt tripping of continuous spinning machines Low grade quality of yarn thread due to interruption in power supply Increased losses due to high harmonic distortion Varying load profile thus making traditional power

    Enquiry Now

    Textiles Spinning Industries Solution

  • Textiles Weaving Industries Solution
    Typical Challenges Presence of high harmonic distortion, iTDD exceeding standard limit specified by IEEE Low true power factor Increased losses due to high harmonic distortion Occasional failure of sensitive electronic cards, malfunctioning of control circuits and therefore abrupt tripping of

    Enquiry Now

    Textiles Weaving Industries Solution

  • FMCG Industries Solution
    Typical Challenges Presence of high harmonic distortion, iTDD exceeding standard limit specified by IEEE Recurrent failure of expensive electronic cards, frequent failure of AC capacitor banks and malfunctioning of control circuits Production down-time due to halt in operation of continuous

    Enquiry Now

    FMCG Industries Solution

  • Printing Industries Solution
    Typical Challenges Recurrent tripping and malfunction of printing machine (city line/high line) Low power factor Increased losses due to high harmonic distortion and low power factor Interruption in operation of continuous printing machines   Root Cause Analysis High level of harmonic

    Enquiry Now

    Printing Industries Solution

  • Construction Industries Solution
    Typical Challenges Hunting of Diesel Generator even at partial loading condition Heating of DG alternator Low power factor leading to increased reactive stress   Root Cause Analysis Complex load profile of heavy construction machines such as crane and welding demanding high reactive power which

    Enquiry Now

    Construction Industries Solution

  • Hospitality Industries Solution
    Typical Challenges Flickering and failure of lighting fixtures Interrupted operation of lifts/elevators Overloading and burning of neutral conductor   Root Cause Analysis High harmonic distortion generated by large chiller units, lifts/elevators and lighting loads Fluctuating load profile and

    Enquiry Now

    Hospitality Industries Solution

  • Pharma / Chemical Industries Solution
    Typical Challenges Failure of sophisticated testing machinery and micro-processor controlled sensitive equipment Discontinued operation of crucial process such as synthesis, fermentation, milling and granulation Interruption in crucial drug formulation process   Root Cause Analysis High

    Enquiry Now

    Pharma / Chemical Industries Solution



Looking for Product Name ?